Home » Archive

Articles Archive for 14 July 2008

Projects »

We’ve poured a lot of work into the basement in the past three weeks since we started working away on this project again.  In that time we’ve planned, re-planned, wired, ran about a mile of cabling, framed, replaced things and tried to kill me a few times with electricity.  As it stands, I’ve been shocked 5 times now and tried to weld an electrical outlet to the wall once.  Stay would like to point out that the number of times that electricity has run through his body still stands at …


Fatal error: Allowed memory size of 33554432 bytes exhausted (tried to allocate 7065559 bytes) in /home/seuforum/public_html/jonathantorrell/wp-includes/wp-db.php on line 429