Three-Week Status
July 14th, 2008 Posted in ProjectsWe’ve poured a lot of work into the basement in the past three weeks since we started working away on this project again. In that time we’ve planned, re-planned, wired, ran about a mile of cabling, framed, replaced things and tried to kill me a few times with electricity. As it stands, I’ve been shocked 5 times now and tried to weld an electrical outlet to the wall once. Stay would like to point out that the number of times that electricity has run through his body still stands at zero.
At this point, we’re about ready to move on to drywall. Then paint. Then tile. So there’s still a ways to go to get things done, but we’re getting there nonetheless. We’ll be having a painting party if anyone really would like to attend. Date to-be-announced. Obviously actually getting the walls done still stands in the way of that. I guess I should start looking for furniture and electronics.
I’ve posted updates on the Projects page if you want to read more.